TrePaul86's SAS Build-up
#251
#264
Why the billet pieces and then the lower tie rod? Was that just to keep the outers parallel during setup/welding?
Also, did you make two passes on that C when welding?? Something that thick I'd want a good hot root pass and then a wider, slightly cooler, slower final pass. If not, at least pre-heat them.
I'm not hatin on your project but just curious of how you've been doing it.
GB :)
Also, did you make two passes on that C when welding?? Something that thick I'd want a good hot root pass and then a wider, slightly cooler, slower final pass. If not, at least pre-heat them.
I'm not hatin on your project but just curious of how you've been doing it.
GB :)
#268