TJtheman007's Toy Hauler Build (1956 GMC Scenicruiser Bus)
#27
Join Date: Oct 2007
Location: Kankakee, IL
Posts: 270
Likes: 0
Received 0 Likes
on
0 Posts
#30
My wife would flip if I brought that home... That would definatly fill my home time though. Since working off shore / out of the country, the only thing I do when I get home is fix whatever broke while I was gone. Now that I've been home since March I only have 2 things left on the honey do list and I'm waiting on her to make up her mind on those.
I have a soft spot for Jeeps and VW sandrails and I can't let them go to the scrapyard either.
Good luck with this beast.
I have a soft spot for Jeeps and VW sandrails and I can't let them go to the scrapyard either.
Good luck with this beast.
Last edited by Y2KTJ; 06-19-2012 at 10:47 AM. Reason: my spelling sucked!!!!
#31
Join Date: Oct 2007
Location: Kankakee, IL
Posts: 270
Likes: 0
Received 0 Likes
on
0 Posts
Its actually already bagged. In fact, it was one of the first bus to have air bag suspension AND air conditioning along with a bathroom.
I do want to give it the appearance that it is dropped though. I think that would be cool. Lower where the wheel well areas are.
#33
Join Date: Oct 2007
Location: Kankakee, IL
Posts: 270
Likes: 0
Received 0 Likes
on
0 Posts
#38
Join Date: Oct 2007
Location: Kankakee, IL
Posts: 270
Likes: 0
Received 0 Likes
on
0 Posts
There actually just recently were some guys that I know who also own Scenicruisers like mine that were featured in a movie. The production company basically rented them out. Sounded pretty cool! They have their's restored to what it would look like in that time period... I think I am just going to make a sweet RV out of mine.
I may do something similar to Red Bull's scenicruiser as far as the paint goes.... we'll see.
I may do something similar to Red Bull's scenicruiser as far as the paint goes.... we'll see.
#39
Join Date: Oct 2007
Location: Kankakee, IL
Posts: 270
Likes: 0
Received 0 Likes
on
0 Posts
Ok, here is another video.
Part 2 of three of the engine removal
Run time: 23 minutes
Part 2 of three of the engine removal
Run time: 23 minutes