Suspension Tech General discussion of suspension for the Ford Ranger.

Rcd Q

Thread Tools
 
Search this Thread
 
  #1  
Old 02-12-2007
99ranger4x4's Avatar
RF Veteran
Thread Starter
iTrader: (3)
Join Date: Jun 2006
Location: Austin, TX
Posts: 12,198
Likes: 0
Received 3 Likes on 3 Posts
Rcd Q

i have been reading through all the RCD write ups, and now its time to show em all to the rents and try and get it as a graduation present..

anyways, im in a suspension class at Austin Community College, the classes ar dirt cheap since im still in High school. and my teacher said we could install a suspension lift in class, and it would be cool...

so heres my question, to everyone that has done one, how long does it take? i will have access to a full tool room with virtually any tool i need, air tools, welders, torches, u name it..

im in the class for 5 hrs once a week.. and im willing to leave my truck there if i have to...

Thanks
-Matt
 
  #2  
Old 02-12-2007
gatorblue92's Avatar
RF Veteran
Join Date: Jun 2004
Location: Delaware
Posts: 8,238
Likes: 0
Received 2 Likes on 2 Posts
well it took Ranger1 and I about 2 weeks to do his truck but only about 3 days of actually working and of those 3 days at least 2 were spent getting parts/tools or BS'ing
 
  #3  
Old 02-12-2007
99ranger4x4's Avatar
RF Veteran
Thread Starter
iTrader: (3)
Join Date: Jun 2006
Location: Austin, TX
Posts: 12,198
Likes: 0
Received 3 Likes on 3 Posts
so if i have, say...5 guys working at it, and any tools i need/want at my disposal.. should 5 hrs do it?
 
  #4  
Old 02-12-2007
jrpro130's Avatar
RF Veteran
iTrader: (1)
Join Date: Sep 2005
Location: Florida
Posts: 5,057
Likes: 0
Received 1 Like on 1 Post
Originally Posted by 99ranger4x4
so if i have, say...5 guys working at it, and any tools i need/want at my disposal.. should 5 hrs do it?
I would allow two full days.

If you work a reg work schedule, do it on friday after you get out of work, saturday all day, and wheel it sunday.

Edit: FWIW, 2 people is enough for a lift.
 
  #5  
Old 02-12-2007
gatorblue92's Avatar
RF Veteran
Join Date: Jun 2004
Location: Delaware
Posts: 8,238
Likes: 0
Received 2 Likes on 2 Posts
Originally Posted by 99ranger4x4
so if i have, say...5 guys working at it, and any tools i need/want at my disposal.. should 5 hrs do it?
i wouldnt count on it unless there is someone there who has done one before... it is alot of work so you should plan on 2 days
 
  #6  
Old 02-12-2007
99ranger4x4's Avatar
RF Veteran
Thread Starter
iTrader: (3)
Join Date: Jun 2006
Location: Austin, TX
Posts: 12,198
Likes: 0
Received 3 Likes on 3 Posts
2 days.. full days or 5 hr days?

aye, either way, that 5" looks sexy haha
 
  #7  
Old 02-12-2007
99ranger4x4's Avatar
RF Veteran
Thread Starter
iTrader: (3)
Join Date: Jun 2006
Location: Austin, TX
Posts: 12,198
Likes: 0
Received 3 Likes on 3 Posts
the teacher is the shop foreman at a chevy dealer, and has a race team, sure he may not have done a suspension lift, but atleast hes not clueless right? lol
 
  #8  
Old 02-12-2007
99ranger4x4's Avatar
RF Veteran
Thread Starter
iTrader: (3)
Join Date: Jun 2006
Location: Austin, TX
Posts: 12,198
Likes: 0
Received 3 Likes on 3 Posts
i guess ill just talk to him and see what he thinks.. thanks guys
 
  #9  
Old 02-12-2007
jrpro130's Avatar
RF Veteran
iTrader: (1)
Join Date: Sep 2005
Location: Florida
Posts: 5,057
Likes: 0
Received 1 Like on 1 Post
Yea, I mean, i've done a couple little things that took way longer than expected, then a bl with no air tools in 8hrs...

My spindles took 12 hrs from start to finsih, thats including the trips to stores, food, etc. Work time was probably 6-7hrs.

Also, AAL was crazy, took mine 30 mins, and kevin(kevoo) about 5hrs...






Bottom line, leave yourself enough room. Don't rush. Use the right tools, or don't do it!!! Thats my new motto, tools are everything!!!
 
  #10  
Old 02-13-2007
Gearhead61's Avatar
RF Veteran
Join Date: May 2005
Location: College Station, TX
Posts: 5,782
Likes: 0
Received 2 Likes on 2 Posts
If you can get two people on the front and one person on the rear, all working with air tools, and all knowing what they're doing, you could probably get it done in 5 hrs. My superlift probably took me a total of 12 hrs. to install, but I was working by myself with no real knowlege of the suspension, and with hand tools. Sometimes I'd spend 20 minutes trying to break a single bolt loose!
 
  #11  
Old 02-13-2007
Big04Ranger's Avatar
Member
Join Date: Nov 2005
Location: Avon, IN
Posts: 756
Likes: 0
Received 0 Likes on 0 Posts
took me 7hrs for the RCD.. me and a friend. lift, air tools, knowledge... reason it took so long is that the nuts, bolts and crap are poorly labled.. that and there is a alot of drilling holes and i had a dull bit.. bit is the main reason it took so long
 
  #12  
Old 02-13-2007
99ranger4x4's Avatar
RF Veteran
Thread Starter
iTrader: (3)
Join Date: Jun 2006
Location: Austin, TX
Posts: 12,198
Likes: 0
Received 3 Likes on 3 Posts
aight, well

it will probably take 3 weeks ( 3 classes) we have to get a lecture for like an hr and a half, so that leaves 3.5 hrs to work a day.. and we dont too much, either

ill do it while my lisence is suspended so im not missing out on much
 
  #13  
Old 02-21-2007
Ranger44's Avatar
Member
Join Date: Feb 2007
Location: Southern California
Posts: 50
Likes: 0
Received 0 Likes on 0 Posts
It would take a professional approx. 12hrs to install this kit, with welding, and alignment afterwards.
 
  #14  
Old 02-21-2007
Join Date: Nov 2005
Location: Charlestown, IN
Posts: 1
Likes: 0
Received 4 Likes on 4 Posts
welllllll......to be honest with you i dont think the RCD will fit on your truck.....because the RCD was designed for the "live" axle front ends on the 2000 or 2001 + Rangers.....your truck has the Pulse Vaccum Hubs.......the only 2 suspension lifts on the market for your truck is Superlift and TrailMaster.......

unless you plan on repacing your whole front end....it wont work...
 
  #15  
Old 02-21-2007
RangerNVS's Avatar
Member
iTrader: (1)
Join Date: Mar 2005
Location: Temple, TX
Posts: 1,341
Likes: 0
Received 2 Likes on 2 Posts
It took me 2 days to do my Superlift and that was me by myself and air....give yourself plenty of time, make sure you have all the tools you need, and don't be in a big hurry, do it right the first time and don't cut corners.
 
  #16  
Old 02-21-2007
zabeard's Avatar
who?
iTrader: (8)
Join Date: Nov 2004
Location: IN
Posts: 26,044
Likes: 0
Received 10 Likes on 10 Posts
i think it can be done in 1 day.

also it wont work on your truck you need the live axles.
 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
bikerman45
Ranger Products, Company, & Member Reviews
31
03-26-2008 08:47 PM
Ranger1
Suspension Tech
39
12-18-2005 08:43 PM
Gearhead61
Wheels & Tires Semi-Tech
41
11-24-2005 06:48 PM
Mudhippy
Suspension Tech
18
10-24-2005 03:52 AM
JP03RFX4
Suspension Tech
9
08-29-2005 10:07 PM



Quick Reply: Rcd Q



All times are GMT -6. The time now is 07:03 PM.