Shop hours
#2
RF Veteran
iTrader: (1)
Good read here on thermostat housing: https://howtoreplacefordthermostathousing.com/
Said it took him 6 hours first time, so make it 4-5 hours for Pro mechanic that has done it before
To do valve covers you also need to drain some coolant because you need to remove coolant hoses
Passenger side takes longer maybe 2.5 hours, drivers side 2 hours at the longest, depends on how easy EGR tube comes off
The Knock sensor wire connector is on the passenger side top edge of valve cover and its wires like to break, lol, PITA to repair as they are brittle
Said it took him 6 hours first time, so make it 4-5 hours for Pro mechanic that has done it before
To do valve covers you also need to drain some coolant because you need to remove coolant hoses
Passenger side takes longer maybe 2.5 hours, drivers side 2 hours at the longest, depends on how easy EGR tube comes off
The Knock sensor wire connector is on the passenger side top edge of valve cover and its wires like to break, lol, PITA to repair as they are brittle
Thread
Thread Starter
Forum
Replies
Last Post